What do I need in order to set up the 4 L, 18 L, 52 L, 215 L, and 225 L CYCLE-TAINER solvent delivery system?

Answer
There are several configuration options for CYCLE-TAINER solvent delivery system. At minimum, you will need:
  • Gas supply to provide positive pressure to dispense the solvent.
  • Gas regulator to regulate the gas supply pressure.
  • Tubing and Quick-Connects to direct gas and solvent vent line for pressure relief valve vent line for pressure rupture disk.
  • Solvent line.
  • Gas line.
  • Ventilation may be needed during operation in the event of over pressurization of the container.
  • Grounding to eliminate static electricity build up near the flammable solvent.
  • An area for proper storage of the container. The CYCLE-TAINER solvent delivery system should be stored upright in a cool, clean, covered area.

 

 

 

Trademarks are owned by Avantor Performance Materials, LLC. or its affiliates unless otherwise noted.
2018 Avantor Performance Materials, LLC.

File 
KeywordsCTS

Feedback

 

Was this article helpful?


   

Feedback

Please tell us how we can make this article more useful.

Characters Remaining: 255